When is the best time to Perform Commercial Parking Lot Repairs?

 * Asphalt patching can be successfully performed from  April 15th thru December 10th. Cold patching can be done year round, but is temporary.
    * Seal coating should be done between April 15th and October 30th.
    * Complete repaving should be done between April 15th and November 30th, weather permitting 40- 45 degrees
    * Striping should be done between March 15th and December 15th, but can be done during the winter if the conditions are dry and above freezing.
    * Hot crack filling can be done 12 months a year as long as the pavement is dry.