When is the best time to Perform Commercial Parking Lot Repairs? |
* Asphalt patching can be successfully performed from April 15th thru December 10th. Cold patching can be done year round, but is temporary.
* Seal coating should be done between April 15th and October 30th. * Complete repaving should be done between April 15th and November 30th, weather permitting 40- 45 degrees * Striping should be done between March 15th and December 15th, but can be done during the winter if the conditions are dry and above freezing. * Hot crack filling can be done 12 months a year as long as the pavement is dry. |